HydroSim XP

HydroSim XP is a multi-reservoir hydroelectric simulation model with an extensive representation of operational constraints.

Previous Slide 1/7 NextPolicy operation data entryHydroSim XPPolicy operation data entryInflow data entry.HydroSim XPInflow data entry.Outflow results.HydroSim XPOutflow results.Hydro constraints analysis.HydroSim XPHydro constraints analysis.Hydraulic validation wizard through PDP-Web files.HydroSim XPHydraulic validation wizard through PDP-Web files.Options for export data on the PDP-Web file format.HydroSim XPOptions for export data on the PDP-Web file format.Options for import data on the PDP-Web file format.HydroSim XPOptions for import data on the PDP-Web file format.

 

Note: HydroSim XP is part of the decision support system called HydroExpert.

HydroSim XP main features

Simulation Model

  • Detailed representation of hydroelectric production power function. Forebay and tailrace variable water levels. Turbine efficiency function (hill curves).
  • User defined operational policies: simulates decisions based on total discharges or hydro generation.
  • Configurable time intervals: half-hour, hour, day, week and month.
  • Simulates reservoirs, powerhouses, deviation structures (channels and tunnels) and control points/stations.
  • Multi-reservoir operation: up to 180 Brazilian hydro plants and reservoirs available into HydroData database.

Graphic Interface

  • Friendly and rich graphic interface with advanced resources for simulated operation analysis.